Italian Travertine, from quarry to the United States
Construction
An international company needed to source travertine in Italy for a project in the United States.The requirement involved much more than identifying a quarry or receiving a quotation.Different suppliers were considered according to the characteristics of the material, availability, production capabilities and the specific requirements of the project.Once the appropriate supplier had been identified, discussions moved into the commercial and operational side of the project.Pricing and conditions were negotiated, quantities and specifications were clarified, and communication between the Italian supplier and the American team was maintained throughout the process.The work then moved into logistics.The material had to be prepared in Italy, coordinated with the shipping arrangements and moved internationally while keeping the different parties aligned on timing, quantities and documentation.The value of having someone locally involved became particularly evident during the stages where decisions had to be made quickly or information needed to be verified directly.What began as a sourcing requirement therefore became a broader process involving supplier selection, negotiation, production coordination and international logisticsThe result was not simply a supplier relationship.It was a managed process connecting an Italian source with a project thousands of kilometres away.
An executive meeting in Italy, built around the people attending
Business Travel
An international company wanted to bring its senior management team to Italy for a combination of meetings, hospitality and shared experiences.
The programme was not based on a standard incentive package.
The schedule was built around the people attending, the purpose of the meeting and the type of experience the company wanted to create.
The process involved finding suitable locations, coordinating accommodation and transportation, arranging meeting spaces, selecting restaurants and developing experiences that would fit naturally around the business programme.
The practical details were extensive.
Arrival times had to work with the meeting schedule.
Transportation needed to connect different locations efficiently.
Restaurants needed to accommodate the group and the desired atmosphere.
Experiences had to be appropriate for an executive audience rather than simply being tourist activities.During the programme, local coordination continued throughout the stay, allowing changes and last-minute requirements to be handled without becoming an issue for the participants.
The value was not in providing a pre-designed itinerary.
It was in building the experience around the company and its people.The executives could concentrate on their meetings and on spending time together, while the operational complexity remained in the background.
The challenge was not simply understanding the formal requirements.
Construction
For a construction project in Italy, we assisted a foreign company in managing all technical documentation and regulatory compliance required under Italian construction site laws.
Our scope extended beyond general consultancy: we directly drafted the essential operational and safety documents—including the POS (Safety Operational Plan), PSC (Safety and Coordination Plan), and related technical documentation—while providing qualified specialists and certified technicians on-site to fulfill all legal requirements.
In complex projects involving electrical, fire protection, and HVAC systems across multiple disciplines, the real challenge lies in ensuring full integration alongside individual technical compliance. We acted as the local technical bridge between the international client, designers, engineers, and local contractors, ensuring that queries or updates from one discipline were seamlessly coordinated across all teams.
The key value we provided included:• A single local point of reference: Clear, direct on-site support for the international client whenever technical decisions or follow-ups were required in Italy.• A streamlined process: Unifying separate regulatory and technical tasks into a single coordinated workflow.• On-site technical expertise: Combining regulatory knowledge with hands-on technical management on the field.
Ultimately, we combined deep technical and regulatory expertise with what matters most in complex international projects: clear coordination between people, local regulations, and client expectations.
Finding the right italian suppliers for a complex international project
Strategic Sourcing & Procurement
An international company was looking to source a number of specialized products and components from Italy for an upcoming project.
The initial requirement appeared relatively straightforward: identify suitable Italian suppliers and obtain competitive quotations.
In practice, the process was more complex.
The products required specific technical characteristics, consistent quality and the ability to meet an international delivery schedule. The company also needed to understand whether potential suppliers had the production capacity to support the project and whether they were accustomed to working with international customers.
The sourcing process therefore started with the requirements rather than with a list of suppliers.Potential manufacturers were researched and evaluated according to their capabilities, previous experience, production capacity, commercial conditions and ability to meet the project's requirements.Once a shortlist had been established, communication with the suppliers was coordinated locally.Questions were clarified, specifications were reviewed and quotations were compared on more than price alone.
In some cases, alternative solutions were identified that could achieve the same result while improving cost or lead time.
The final selection was based on the overall value of each supplier rather than simply the lowest quotation.The project demonstrated an important aspect of international procurement:finding a supplier is only the first step.
Understanding who is behind the quotation, what they can actually deliver and how well they fit the requirements can be just as important as negotiating the final price.
The result was a more informed procurement decision and a supplier network better aligned with the project's technical and commercial requirements.
When a delivery delay threatened an international project
Problem solving & crisis management
An international client was waiting for materials required for a project in Italy.The delivery was delayed, and the original timeline was beginning to come under pressure.The first information received from the supplier was not sufficient to understand the actual situation.
What had caused the delay?
When would the material really be available?
Was the original delivery date still achievable?
And, if not, what alternatives were available?
Rather than continuing to manage the issue through a series of emails between different countries, the situation was followed up locally.
The supplier was contacted directly and the circumstances surrounding the delay were clarified.The production status was checked, the remaining timeline was reviewed and the possible alternatives were identified.
At the same time, the implications for the other parties involved in the project were assessed.This created a clearer picture of the situation and allowed decisions to be made based on actual information rather than assumptions.
An alternative logistics solution was then coordinated to reduce the impact of the delay.The original schedule could not be restored completely, but the consequences were contained and the project was able to continue without the issue developing into a much larger disruption.
The value in this type of situation is rarely about finding a perfect solution.
Sometimes the original solution is no longer possible.The real value is in understanding what has happened quickly, establishing the available options and keeping the project moving.
Managing the details behind an UHNW client’s life in Italy
Private client management
An international UHNW client with interests and commitments in Italy required local support for a range of personal and practical matters.
The initial request was made and managed by the client’s Private Assistant in the country of origin, who was looking for a trusted local point of reference in Italy capable of handling matters that required someone physically present on the ground.
What initially appeared to be a one-off collaboration quickly evolved into an ongoing working relationship.
The requirements were varied and not limited to a single project. They included coordinating local suppliers, managing property-related matters, arranging transportation and travel, following up with maintenance and service providers, and handling requests that required local presence and immediate attention.
The role was to work closely with the client’s Private Assistant, taking responsibility for the Italian side of each request and ensuring that matters were handled efficiently without requiring the client to become directly involved.
Requests were assessed individually and directed to the appropriate professionals or suppliers. Appointments and activities were coordinated, information was followed up, and any issues requiring immediate attention were managed locally.
Some matters were planned well in advance.
Others arose unexpectedly and required a quick response, often with little notice. In these situations, the ability to have someone reliable on the ground meant that issues could be addressed promptly while keeping communication with the Private Assistant clear and proportionate.
Discretion was an essential part of the relationship.
Information was handled strictly on a need-to-know basis, and communication was maintained primarily through the client’s Private Assistant, ensuring that the established structure around the client remained respected.
As the number and variety of requests increased, the nature of the collaboration changed.
What had initially been intended as a specific, one-time assignment became a long-term collaboration, with an increasing level of trust and familiarity with the client’s preferences, priorities and way of working.
The value was therefore not in any individual task.
It was in becoming a trusted local extension of the client’s Private Assistant in Italy — someone who could take responsibility for the details, coordinate the right people and ensure that whatever required attention locally was properly taken care of.
For an UHNW client managing an international lifestyle, this created something particularly valuable:the confidence that Italy was being taken care of by someone trusted on the ground, without the client or their Private Assistant having to manage every detail from abroad.